Award pendingAirport engineering services

BKP 197 Geometer / P19AA532 ZRH Tower

Key points at a glanceAI summary

Flughafen Zürich AG is buying continuous monitoring of the ZRH Tower construction excavation and nearby existing structures, because the existing tower cannot be renovated and is being replaced beside the operating airport.

Deliverables
Measure vibrations and settlements at nearby structures, surfaces and excavation supports.
Eligibility
Provide three comparable-complexity provider references from the last five years and three same-role references for key person 1.
Award
The fee offer carries 100% of the award weighting.
Watch out
The offer remains binding for six months.

Documents for your bid

  • Teil A.zipTender documents · 943 KB
  • Teil B.zipTender documents · 119.6 MB
  • Teil C.zipTender documents · 843 KB
  • DTW_P20_A30_41_BAH_GAB_BIT_LV_Überwachung Baugrube und Bestand.xlsxQuestions round · 35 KB

Download the documents

Create your free Sealio account: download the documents of this tender and see thousands of other tenders from all over Switzerland.

Key dates

  1. 31.08.2026Published on simap.ch
  2. 11.09.2026Questions round
  3. 12.10.2026, 09:00Submission deadline
  4. 12.10.2026Bid opening

The full analysis of this tender

Detailed scope

A structured view of services, requirements and deadlines.

Buyer review

Context on the procurement and the published information.

This tender is closed

Book a demo to see how Sealio finds the next similar tenders for your company.

  • Detailed match against your company profile
  • Go / no-go recommendation
  • Help drafting your bid

Notice text

View on simap.ch

Unofficial reproduction. The German text below is taken unchanged from SIMAP notice no. 43290. Only the official notice is binding.

Zur Sicherstellung der Integrität der Bestandesbauten, Beläge und Baugrubenabschlüsse im Bereich des Baufelds ist eine kontinuierliche messtechnische Überwachung durchzuführen. Die Überwachung umfasst die Messung von Erschütterungen und Setzungen an den relevanten Bauwerken und Belägen in unmittelbarer Nähe der Baugrube sowie an den Baugrubenabschlüssen selbst. Die Messpunkte, Messintervalle und Grenzwerte werden im Prüf- und Kontrollplan festgelegt.

Get started

Ready to win more work?

Bring a live RFP. We'll show you how Sealio handles it in less than 10 seconds.