New construction of Grüt reservoir with pressure boosting system, WV Truttikon-Ossingen
Official title in German: Neubau Reservoir Grüt mit Druckerhöhungsanlage, WV Truttikon-Ossingen
Politische Gemeinde Truttikon is replacing the Grüt reservoir beside the existing facility to improve network pressure and serve both Truttikon and Ossingen.
- Deliverables
- Civil works include reinforced-concrete reservoir construction, core drilling, masonry and plastering.
- Eligibility
- Submit three comparable reservoir-construction references completed within the last seven years.
- Award
- Price weighs 50%; company project references 25%, key-person references 15%, availability 5%, site proximity 5%.
- Watch out
- Account for staged work interruptions in unit prices; no separate travel costs are paid.
Documents for your bid
- 599-029-33_07 Grundrisse.pdfTender documents · 443 KB
- 599-029-33_08 Schnitte 1-3.pdfTender documents · 442 KB
- 599-029-33_09 Schnitt 4 und Ansicht.pdfTender documents · 461 KB
- Off_Baumeister.01sTender documents · 102 KB
- Off_Baumeister.crbxTender documents · 11 KB
- Off_Baumeister.pdfTender documents · 1.9 MB
Key dates
- 31.10.2026Published on simap.ch
- 06.11.2026Questions round
- 27.11.2026, 11:00Submission deadlineDeadline in 27 days
The full analysis of this tender
Detailed scope
A structured view of services, requirements and deadlines.
Buyer review
Context on the procurement and the published information.
Is this tender a fit for your company?
Book a demo and we will walk through this tender with your company profile.
- Detailed match against your company profile
- Reasoned go / no-go recommendation
- Help drafting your bid
Notice text
View on simap.ch
Unofficial reproduction. The German text below is taken unchanged from SIMAP notice no. 46841. Only the official notice is binding.
Für die beiden Wasserversorgungen Truttikon und Ossingen soll ein neues Reservoir mit Druckerhöhungsanlage gebaut werden. Dies beinhaltet ein Schieberhaus mit zwei Wasserkammern. Innerhalb des Schieberhauses wird eine Zwischendecke erstellt, um den Notstromgenerator räumlich vom Schieberhaus und der Druckerhöhungsanlage zu trennen. Der Standort vom Reservoir wird nicht verändert. Das Reservoir wird unmittelbar neben dem bestehenden Reservoir realisiert.