Accepting bidsDeadline in 70 daysFlood-prevention works

Flood protection Holzgraben section Bäjiweg-DL Kantonsstrasse, Glis – overall tender Construction works

Official title in German: Hochwasserschutz Holzgraben Abschnitt Bäjiweg-DL Kantonsstrasse, Glis – Gesamtausschreibung Bauarbeiten

Key points at a glanceAI summary

Stadtgemeinde Brig-Glis is procuring flood-protection and associated civil works on the Holzgraben to reduce flood risk through a rebuilt channel, bridge and related infrastructure.

Deliverables
Works include about 1,200 t of waterway blocks, a 105 m concrete retaining wall, a bridge and water-pipe diversions.
Eligibility
Prove adequate staffing and average annual turnover at least twice the offer price; offers must be in German.
Award
Price 50%, references 25%, schedule 20% and sustainability 5%; no negotiation or bid rounds.
Watch out
The offer remains binding for 6 months; a bank or insurance guarantee is required before final payment.

Documents for your bid

  • 015-001_261030_Bestimmungen_Vergabeverfahren_offenes_Verfahren.pdfTender documents · 414 KB
  • 015-002_261030_Angebot_Nachweise_Vergabeverfahren_offenes_Verfahren.pdfTender documents · 421 KB
  • 015-003_261030_AB_HWS_Holzgraben.pdfTender documents · 349 KB
  • 015-004_261030_BB_HWS_Holzgraben.pdfTender documents · 882 KB
  • 015-005_261030_Aussschreibung_HWS_Holzgraben.CRBXTender documents · 2.3 MB
  • 015-005_261030_Aussschreibung_HWS_Holzgraben.pdfTender documents · 4.2 MB
  • Beilage_01_015-006_260116_Technischer_Bericht.pdfTender documents · 1.9 MB
  • Beilage_02_015-41-101 Situation 1_200.pdfTender documents · 710 KB
  • Beilage_03_015-41-102 Längenprofil 1_200_50.pdfTender documents · 732 KB
  • Beilage_04_015-41-103 Querprofile 1_100.pdfTender documents · 1.5 MB
  • Beilage_05_015-41-104 Normalprofile 1_50.pdfTender documents · 1.0 MB
  • Beilage_06_015-41-105_Situationsplan_TW-+ SW-Leitung.pdfTender documents · 6.2 MB
  • Beilage_07_015-41-106_Bauphase_1_200.pdfTender documents · 977 KB
  • Beilage_08_015-41-107 Abbruchplan_1_200.pdfTender documents · 399 KB
  • Beilage_09_015-007_260116_Umweltbericht.pdfTender documents · 3.3 MB
  • Beilage_10_015-008_261030_Submissions-Bauprogramm.pdfTender documents · 271 KB
  • Beilage_11_015-009_261030_Fotodokumentation.pdfTender documents · 1.6 MB
  • Beilage_12_Sytec_normalprofil_fuer_bruecken_ueber_gewaesser.pdfTender documents · 664 KB
  • Beilage_13_Kandelaberfundament Typ 2.pdfTender documents · 306 KB
  • Beilage_14_261027_terminprogramm_grob_MHF_Linus_Sichtweite.pdfTender documents · 84 KB
  • Beilage_15_260714_rp2603_MFH_Linus_Sichtweite_Probenahme.pdfTender documents · 1.6 MB
  • Beilage_16_Randsteine_DMRU.pdfTender documents · 269 KB
  • Beilage_17_NIPL_Holzgraben.pdfTender documents · 1.5 MB

Download the documents

Create your free Sealio account: download the documents of this tender and see thousands of other tenders from all over Switzerland.

Key dates

  1. 02.11.2026Published on simap.ch
  2. 27.11.2026Questions round
  3. 11.01.2027, 16:00Submission deadlineDeadline in 70 days
  4. 14.01.2027, 16:00Bid opening

The full analysis of this tender

Detailed scope

A structured view of services, requirements and deadlines.

Buyer review

Context on the procurement and the published information.

Is this tender a fit for your company?

Book a demo and we will walk through this tender with your company profile.

  • Detailed match against your company profile
  • Reasoned go / no-go recommendation
  • Help drafting your bid

Notice text

View on simap.ch

Unofficial reproduction. The German text below is taken unchanged from SIMAP notice no. 46851. Only the official notice is binding.

Hochwasserschutz Holzgraben, Abschnitt Bäjiweg–DL Kantonsstrasse, Glis. Gesamtausschreibung aller Bauleistungen (Baumeister, Sanitär, Metallbau) für die Hochwasserschutzmassnahmen: provisorische Bachumleitung (DN 400), Neubau Bachgerinne mit Wasserbausteinen, Stützmauer in Ortbeton (ca. 105 m), Nagelwand, Neubau Brücke, Umlegung Trinkwasser- und Schmutzwasserleitungen, Strassen- und Wegbau sowie Umgebungsarbeiten. Bauzeit 30.03.2027 bis 23.12.2027.

Get started

Ready to win more work?

Bring a live RFP. We'll show you how Sealio handles it in less than 10 seconds.