Hauterive/FR, Switzerland / Corrosion protection for penstock
Official title in French: Hauterive/FR, Suisse / Protection anti-corrosion conduite forcée
Groupe E SA is renewing the anti-corrosion coating of a 180 m steel-lined tunnel to protect the installation.
- Deliverables
- The work covers the full coating renewal of a steel-lined tunnel, 4 m in diameter.
- Eligibility
- At least three similar references from the past 7 years are required, on steel hydroelectric tunnels or penstocks at least 3 m in diameter.
Documents for your bid
- Annexe_Q9_Références_soumissionnaire.pdfAdvance notice · 139 KB
Key dates
- 09.09.2026Published on simap.ch
- 14.10.2026Questions round
- 10.11.2026, 12:00Submission deadlineDeadline in 14 days
The full analysis of this tender
Detailed scope
A structured view of services, requirements and deadlines.
Buyer review
Context on the procurement and the published information.
Is this tender a fit for your company?
Book a demo and we will walk through this tender with your company profile.
- Detailed match against your company profile
- Reasoned go / no-go recommendation
- Help drafting your bid
Notice text
View on simap.ch
Unofficial reproduction. The French text below is taken unchanged from SIMAP notice no. 40142. Only the official notice is binding.
Les travaux prévus comprennent le renouvellement complet du revêtement anti-corrosion d'une galerie blindée en acier de 180 m. linéaire et d'un diamètre de 4 m.