The Federal Roads Office (OFROU), Western Road Infrastructure Division, is building a multifunctional site at its Bursins CeRN location and preparing 3PS work areas in three municipalities.
- Deliverables
- Works include an approximately 5,000 m² asphalted site, utility conduits, a SETEC structure and three additional site areas.
- Eligibility
- Bidders need one completed comparable project, and annual turnover at least twice the contract value, apportioned over performance.
- Award
- Price weighs 40%; four quality and duration criteria each weigh 15%.
- Watch out
- Subcontractors may perform at most 50% of the required work value.
Key dates
- 17.08.2026Questions round
- 10.09.2026Published on simap.ch (Correction)
- 25.09.2026, 23:59Submission deadline
- 01.10.2026Bid opening
The full analysis of this tender
Detailed scope
A structured view of services, requirements and deadlines.
Buyer review
Context on the procurement and the published information.
This tender is closed
Book a demo to see how Sealio finds the next similar tenders for your company.
- Detailed match against your company profile
- Go / no-go recommendation
- Help drafting your bid
Notice text
View on simap.ch
Unofficial reproduction. The French text below is taken unchanged from SIMAP notice no. 40833. Only the official notice is binding.
Le présent marché concerne les travaux de la réalisation d’une place multifonctionnelle sur le site du CeRN à Bursins ainsi que la réalisation des travaux préparatoires pour 3PS (réalisation des places d’installation de chantier) situés sur les communes de Perroy, Luins et Duillier. Les travaux principaux sont : Réalisation d’une place multifonctionnelle d’environ 5'000 m2 en enrobé ; Déplacement de batteries de tubes et canalisations ; Construction d’un SETEC ; Travaux de terrassement pour la réalisation d’un étang de compensation ; Construction de 3 places d’installation de chantier annexes. Les quantités principales sont approximativement : Excavation : 17'350 m3 Remblais : 3’000 m3 Enrobé : 1'700 to Béton : 650 m3 GNT 0/45 : 3'000 m3