CE4600008921 - RC 618-B-P & 601-B-P - Lucens & Curtilles
The Vaud mobility and roads directorate is procuring civil works to transform three structures and create an active-mobility path in Lucens and Curtilles.
- Deliverables
- Works include 408 t of bituminous surfacing, 165 m3 of concrete and 35 m3 of BFUP.
- Eligibility
- Offers require paid social contributions, taxes and SUVA premiums, plus declarations; breaches are eliminatory.
- Award
- Price weighs 55%; award requires a weighted average of at least 3 across criteria 2 to 5.
- Watch out
- The offer remains binding for 12 months; submitted offer documents must be in French.
Documents for your bid
- 01_Contrat.zipTender documents · 54 KB
- 02_CP.zipTender documents · 265.5 MB
- 03_SP.zipTender documents · 891 KB
- 04_Plans.zipTender documents · 23.3 MB
- 05_PAQ.zipTender documents · 1.1 MB
- 06_Autres_Documents.zipTender documents · 6.4 MB
Key dates
- 12.10.2026Published on simap.ch
- 02.11.2026Questions round
- 20.11.2026, 11:00Submission deadlineDeadline in 23 days
- 20.11.2026, 11:00Bid opening
The full analysis of this tender
Detailed scope
A structured view of services, requirements and deadlines.
Buyer review
Context on the procurement and the published information.
Is this tender a fit for your company?
Book a demo and we will walk through this tender with your company profile.
- Detailed match against your company profile
- Reasoned go / no-go recommendation
- Help drafting your bid
Notice text
View on simap.ch
Unofficial reproduction. The French text below is taken unchanged from SIMAP notice no. 44975. Only the official notice is binding.
Dégrappage des enrobés bitumineux 438 t Fraisage des enrobés bitumineux 147 t Démolition béton / pierre 31 m3 Terrassement 90 m3 Purge grave 421 m3 GNT 0/45 non-gélive 298 m3 Coffrage 177 m2 Béton 165 m3 Acier d’armature 11.5 t BFUP 35 m3 Système d’étanchéité (PMMA + LBP) 17 m2 Asphalte coulé MA 44 t Revêtements bitumineux 408 t Joints en bitume-polymère appliqué à chaud 259 m Bordure granite type Etat de Vaud 173 m Dispositif de retenue définitif 53 m Dispositif de retenue provisoire 35 m