Award pendingSoftware package and information systems

Process control system for the seawater plant for EWR

Official title in German: Prozessleitsystem Seewasserwerk für EWR

Key points at a glanceAI summary

Genossenschaft EW Romanshorn is procuring a process control system for its seawater treatment plant and drinking-water supply, including staged commissioning during live operations and associated upgrades.

Deliverables
Configure, supply, install and commission the system; engineer cabinets and create electrical schematics using modern CAD.
Eligibility
Prove three specified references, including a redundant seawater plant, and offer a standard system, not a development.
Watch out
Schematics must be supplied at no extra cost in CAD source format or at least DXF and PDF.

Documents for your bid

  • Sub_EWR_01_Geheimhaltungsvereinbarung_a_kr.docxTender documents · 37 KB

Download the documents

Create your free Sealio account: download the documents of this tender and see thousands of other tenders from all over Switzerland.

Key dates

  1. 23.09.2026Published on simap.ch
  2. 09.10.2026Questions round
  3. 19.10.2026, 15:00Submission deadline

The full analysis of this tender

Detailed scope

A structured view of services, requirements and deadlines.

Buyer review

Context on the procurement and the published information.

This tender is closed

Book a demo to see how Sealio finds the next similar tenders for your company.

  • Detailed match against your company profile
  • Go / no-go recommendation
  • Help drafting your bid

Notice text

View on simap.ch

Unofficial reproduction. The German text below is taken unchanged from SIMAP notice no. 44550. Only the official notice is binding.

Parametrierung, Lieferung, Installation und Inbetriebnahme eines Fernwirk- und Prozessleitsystems für die Wasseraufbereitung im Seewasserwerk und die Trinkwasserversorgung der Genossenschaft Elektrizitätswerk Romanshorn. Dazu gehört auch das Hardware-Engineering der Schaltschränke und die Erstellung des Elektroschemas in modernem CAD-System. Im Weiteren ist die Koordination einer etappenweisen Inbetriebsetzung unter laufendem Betrieb des Seewasserwerks inkl. Umbauten und Demontagen ein Auftragsbestandteil.

Get started

Ready to win more work?

Bring a live RFP. We'll show you how Sealio handles it in less than 10 seconds.