Accepting bidsDeadline in 10 daysBuilding construction work

Complete renovation of Auenfeld Barracks, Frauenfeld military training area, 3rd stage, BKP 282.5 Wooden wall claddings, (accommodation building UE)

Official title in German: Gesamtsanierung Kaserne Auenfeld, Wpl Frauenfeld, 3. Etappe, BKP 282.5 Wandbekleidungen aus Holz, (Unterkunftsgebäude UE)

Key points at a glanceAI summary

armasuisse Immobilien is procuring production and installation of wood wall panelling for the Auenfeld barracks accommodation building, part of its refurbishment, to house 636 army personnel.

Deliverables
Produce and install about 850 m2 of veneered wood panelling, with top and bottom solid-wood edging.
Eligibility
Provide two completed wood-panelling references exceeding CHF 400'000 each, from the last 5 years.
Award
Z1 price carries 60%; Z4 sustainability 20%; Z2 key-person references and Z3 technical report 10% each.
Watch out
Barracks operating interruptions and staged work are included in unit prices, with no additional costs.

Documents for your bid

  • Unterlagen BKP 282.5.zipTender documents · 12.7 MB

Download the documents

Create your free Sealio account: download the documents of this tender and see thousands of other tenders from all over Switzerland.

Key dates

  1. 25.09.2026Published on simap.ch
  2. 16.10.2026Questions round
  3. 06.11.2026, 23:59Submission deadlineDeadline in 10 days
  4. 09.11.2026Bid opening

The full analysis of this tender

Detailed scope

A structured view of services, requirements and deadlines.

Buyer review

Context on the procurement and the published information.

Is this tender a fit for your company?

Book a demo and we will walk through this tender with your company profile.

  • Detailed match against your company profile
  • Reasoned go / no-go recommendation
  • Help drafting your bid

Notice text

View on simap.ch

Unofficial reproduction. The German text below is taken unchanged from SIMAP notice no. 44180. Only the official notice is binding.

Das Unterkunftsgebäude (UE) besteht aus einem Erdgeschoss, drei Obergeschossen sowie einem Untergeschoss und dient primär der Unterbringung der Truppen und muss für 636 Angehörige der Armee (AdA) Platz bieten. Die Submission beinhaltet folgende Leistung: Produktion und Montage von furnierter Innenvertäfelung aus Holz bestehend aus einer oberen Ab-schlussleiste und einer unteren Sockelleiste (Massivholzbrett) als durchgehendes, zimmerbreites Element über eine Fläche von ca. 850 m2.

Get started

Ready to win more work?

Bring a live RFP. We'll show you how Sealio handles it in less than 10 seconds.