Award pendingConstruction work

New construction of Upper Secondary School Centre OSZ A, Zofingen / BKP 231.5 PV system

Official title in German: Neubau Oberstufenzentrum OSZ A, Zofingen / BKP 231.5 PV-Anlage

Key points at a glanceAI summary

Einwohnergemeinde Zofingen is procuring a rooftop PV installation for its new secondary school, combining solar generation with extensive green-roof and fall-protection systems.

Deliverables
Supply and install about 642 modules, DC cabling, three GAKs, ballast, fall protection and green roof.
Eligibility
Two completed references from the last five years, each at least CHF 100,000 incl. VAT, for green roofs and 30 cm-raised systems; 15-year product warranties.
Award
Award weights average annual production 40%, performance price 40% and key personnel 20%.

Documents for your bid

  • 2315_Submission PVA OSZA.zipTender documents · 18.2 MB
  • 231.5_Unterlagen Fragenbeantwortung.zipQuestions round · 1.9 MB

Download the documents

Create your free Sealio account: download the documents of this tender and see thousands of other tenders from all over Switzerland.

Key dates

  1. 15.09.2026Published on simap.ch
  2. 28.09.2026Questions round
  3. 26.10.2026, 16:00Submission deadline
  4. 27.10.2026Bid opening

The full analysis of this tender

Detailed scope

A structured view of services, requirements and deadlines.

Buyer review

Context on the procurement and the published information.

This tender is closed

Book a demo to see how Sealio finds the next similar tenders for your company.

  • Detailed match against your company profile
  • Go / no-go recommendation
  • Help drafting your bid

Notice text

View on simap.ch

Unofficial reproduction. The German text below is taken unchanged from SIMAP notice no. 42059. Only the official notice is binding.

Lieferung und Montage einer aufgeständerten PV-Anlage auf dem Dach des neuen Oberstufenzentrums. Im Auftrag enthalten ist der gesamte Aufbau ab der bereits fertigen Dachabdichtung, sprich Trennlage, Drainage und Ballastierungsmatten, sowie die mit der Aufständerung kombinierte Rückhaltevorrichtung zur Personensicherung und die Lieferung des Substrates mit Extensivbegrünung. Anlagegrösse ca. 642 Module à 450Wp = 288.9kWp.

Get started

Ready to win more work?

Bring a live RFP. We'll show you how Sealio handles it in less than 10 seconds.