Energy performance measures (APE) for the buildings of the CHUV hospital complex – Upgrading of the air treatment systems BH10, MAT01, BH FASOL, BU19 – CFC 236
Official title in French: Actions à performance énergétique (APE) pour les bâtiments de la cité hospitalière du CHUV - Travaux de mise à niveau des installations de traitement d’air BH10, MAT01, BH FASOL, BU19 - CFC 236
CHUV’s CIT-S is upgrading air-treatment systems across four hospital projects to replace ageing pneumatic controls and modernise ventilation and control installations.
- Deliverables
- Works cover hydraulic and ventilation upgrades, MCR controls, CHUV supervision and, at BU19 IST, two EC-fan units.
- Eligibility
- The notice states no specific admission requirements.
- Watch out
- Work and commissioning must be phased around CHUV operations; BU19 IST interfaces with the third-floor refurbishment.
- Lot 1
- BH10: upgrade HVAC, hydraulics and MCR controls; remove pneumatic systems.
- Lot 2
- MAT01: replace pneumatic valves and dampers; remove humidifier GP37.
- Lot 3
- FASOL: eliminate pneumatic systems; renew variable-airflow boxes and MCR controls.
- Lot 4
- BU19 IST: replace two air-handling units; install glycol-water heat recovery.
Key dates
- 06.10.2026Published on simap.ch
- 20.10.2026Questions round
- 06.11.2026, 14:00Submission deadlineDeadline in 16 days
Lots
| Lot | Title |
|---|---|
| 1 | Projet BH10 |
| 2 | Projet MAT01 |
| 3 | Projet FASOL |
| 4 | Projet BU19 IST |
The full analysis of this tender
Detailed scope
A structured view of services, requirements and deadlines.
Buyer review
Context on the procurement and the published information.
Is this tender a fit for your company?
Book a demo and we will walk through this tender with your company profile.
- Detailed match against your company profile
- Reasoned go / no-go recommendation
- Help drafting your bid
Notice text
View on simap.ch
Unofficial reproduction. The French text below is taken unchanged from SIMAP notice no. 44925. Only the official notice is binding.
Ce marché intègre les travaux suivants: Projet BH10: mise à niveau des périphériques de régulation pneumatiques, pompes, actionneurs des installations de la centrale de ventilation BH10 du bâtiment BH niveau 10 Projet MAT01: mise à niveau des périphériques de régulation pneumatiques, pompes, actionneurs des installations de centrale de ventilation MAT01 du bâtiment de la maternité: Projet FASOL: Installation de VAV et mise à niveau de la régulation du de la ventilation de la zone FASOL du bâtiment BH niveau 04 ; Projet BU 19 IST : Mise à niveau de la centrale de traitement d'air de la zone IST du bâtiment BU19 IST