Award pendingSanitary works

CHUV main hospital building, level 7 - Project no. 25-035 BH Replacement of cold and hot water pipes, CFC no. 25, plumbing installation work

Official title in French: CHUV bâtiment hospitalier principal niveau 7 - Affaire n° 25-035 BH Remplacement conduites EF-ECS, CFC n° 25, travaux d'installation sanitaires

Key points at a glanceAI summary

CHUV is replacing 40-year-old level 7 hospital water pipes after increasing leaks, blockages and poor hot-water circulation, to renew the network in stainless steel.

Deliverables
Replace cold, domestic hot-water and circulation pipes with stainless steel 1.4521 across 13 intervention phases.
Contract
One lot; seven base phases are mandatory, six optional phases may be ordered wholly or partly.
Watch out
Optional-phase prices remain contractual; the buyer may omit phases without compensation or price changes.
Lot 1
Replace cold, domestic hot-water and circulation pipes on hospital level 7.

Key dates

  1. 02.09.2026Published on simap.ch
  2. 24.09.2026Questions round
  3. 14.10.2026, 11:00Submission deadline
  4. 14.10.2026, 14:00Bid opening

Lots

LotTitle
1Remplacement des conduites d'eau froide, d'eau chaude sanitaire et de circulation du BH niveau 7

The full analysis of this tender

Detailed scope

A structured view of services, requirements and deadlines.

Buyer review

Context on the procurement and the published information.

This tender is closed

Book a demo to see how Sealio finds the next similar tenders for your company.

  • Detailed match against your company profile
  • Go / no-go recommendation
  • Help drafting your bid

Notice text

View on simap.ch

Unofficial reproduction. The French text below is taken unchanged from SIMAP notice no. 43370. Only the official notice is binding.

Les conduites d’eau potable du niveau 07 du Bâtiment Hospitalier (BH) datent de la construction du CHUV et ont donc 40 ans. À la suite du vieillissement de ces dernières, nous commençons à subir une recrudescence de fuites dans certains services, des réseaux d’eau chaude qui s’obstruent et une circulation de l’eau chaude qui n’est plus optimum. Les conduites sont surdimensionnées par rapport aux normes actuelle. C’est pourquoi il a été décidé d’assainir les conduites en fer galvanisé par de nouvelles distribution en inox 1.4521