MP-120043 N02 Second tube San Gottardo (2TG) – Lot 221, civil engineering contractor for the Schöni road wastewater treatment plant (SABA)
Official title in German: MP-120043 N02 Secondo tubo San Gottardo (2TG) – Los 221, Baumeister Strassenabwasserbehandlungsanlage (SABA) Schöni
The Federal Roads Office, infrastructure division East, is procuring the new Schöni road-water treatment plant to drain the second Gotthard tunnel in compliance with law and standards.
- Deliverables
- Build a 33 × 6 × 7 m drainage basin, 52 m block-stone wall, maintenance path, plant structures and outlet.
- Eligibility
- Provide one company reference and one site-manager reference for a sealed basin over 50 m² beside an operating main road, worth at least CHF 1 million each; site manager needs German at B2 or native level and 60% availability.
- Award
- Price weighs 80%; submitted-document content and quality 20%, split equally across four 5% submissions.
- Watch out
- Subcontractors may perform at most 50% of the offer value excluding VAT; the two-year average turnover must exceed twice the offer value.
Key dates
- 18.05.2026Published on simap.ch
- 02.06.2026Questions round
- 06.07.2026, 16:00Submission deadline
- 13.07.2026Bid opening
The full analysis of this tender
Detailed scope
A structured view of services, requirements and deadlines.
Buyer review
Context on the procurement and the published information.
This tender is closed
Book a demo to see how Sealio finds the next similar tenders for your company.
- Detailed match against your company profile
- Go / no-go recommendation
- Help drafting your bid
Notice text
View on simap.ch
Unofficial reproduction. The German text below is taken unchanged from SIMAP notice no. 37210. Only the official notice is binding.
Das Los 221 umfasst den Neubau der Strassenabwasserbehandlungsanlage (SABA) Schöni für die gesetzeskonforme und normgerechte Entwässerung der zweiten Röhre (2TG). Im Einzelnen sind folgende Hauptleistungen zu erbringen (Aufzählung nicht abschliessend): Neubau des Entwässerungsbeckens (Länge ca. 33 m, Breite ca. 6 m, Höhe ca. 7 m), inklusive Zuleitungen und Sicherung der Baugrube in der Nähe der N02; Neubau einer Blocksteinmauer (Länge ca. 52 m, Höhe bis ca. 4 m) und eines Unterhaltswegs; Neubau der SABA Bauwerksteile; Neubau der Ableitung von der SABA in den Vorfluter «Schönizug».