Accepting bidsDeadline in 84 daysElectrical machinery, apparatus, equipment and consumables; lighting

STEP D’AIRE 18 kV substation with control, command and protection systems

Official title in French: STEP D’AIRE Poste 18 kV avec contrôle commande et protections

Key points at a glanceAI summary

Services industriels de Genève (SIG) is procuring engineering, supply, installation and commissioning of 18 kV switchgear with control and protection for the STEP d’Aïre.

Eligibility
Bidders need 10 years’ 18 kV substation experience, must design and manufacture offered switchgear, and provide three recent references.
Award
Price weighs 30%; technical fit and quality 30%, project organisation and after-sales service 20%.
Watch out
Offers bind for 6 months; CHF 10 million liability insurance and 10% performance security are required.

Documents for your bid

  • AO_STEP D’AIRE Poste 18 kV avec contrôle commande.7zTender documents · 15.3 MB

Download the documents

Create your free Sealio account: download the documents of this tender and see thousands of other tenders from all over Switzerland.

Key dates

  1. 30.09.2026Published on simap.ch
  2. 13.11.2026Questions round
  3. 19.01.2027, 10:00Submission deadlineDeadline in 84 days

The full analysis of this tender

Detailed scope

A structured view of services, requirements and deadlines.

Buyer review

Context on the procurement and the published information.

Is this tender a fit for your company?

Book a demo and we will walk through this tender with your company profile.

  • Detailed match against your company profile
  • Reasoned go / no-go recommendation
  • Help drafting your bid

Notice text

View on simap.ch

Unofficial reproduction. The French text below is taken unchanged from SIMAP notice no. 45010. Only the official notice is binding.

Le marché comprend l’ingénierie, la fourniture, la livraison, le montage et la mise en service des cellules 18 kV avec leurs systèmes de contrôle-commande et protection.