Invitation for pre-qualification of EPC contractors – Vungu Solar (Private) Limited

L’essentiel en bref

Vungu Solar (Private) Limited (the "Project Company") is developing the 30MWac Vungu Solar Project, a gridconnected solar photovoltaic independent power project located in the Midlands Province of Zimbabwe.

Points clés du marché

  • The Project was selected by the Government of Zimbabwe as the Government Project Support Agreement (GPSA) Independent Power Producer (IPP) pilot project with the PPA and GPSA
  • The Project Company is owned by InfraCo Africa Business Development Limited (part of the Private Infrastructure Development Group), Energywise Equipment (Private) Limited and

Dates clés

  1. 18.08.2026Publication sur simap.ch
  2. 07.09.2026, 17h00Délai de remise des offres

L’analyse complète de cet appel d’offres

Périmètre détaillé

Vue structurée des prestations, exigences et délais.

Analyse de l’acheteur

Contexte de la procédure et des informations publiées.

Cet appel d’offres est clôturé

Réservez une démo pour voir comment Sealio repère les prochains appels d’offres similaires pour votre entreprise.

  • Comparaison détaillée avec le profil de votre entreprise
  • Recommandation Go / No-Go
  • Aide à la rédaction de votre offre

Texte de la publication

Voir sur simap.ch

Reproduction non officielle. Le texte en français ci-dessous est extrait sans modification de la publication SIMAP n° 42537. Seule la publication officielle fait foi.

Vungu Solar (Private) Limited (the "Project Company") is developing the 30MWac Vungu Solar Project, a gridconnected solar photovoltaic independent power project located in the Midlands Province of Zimbabwe. The Project Company is owned by InfraCo Africa Business Development Limited (part of the Private Infrastructure Development Group), Energywise Equipment (Private) Limited and Impala Power Company Limited, which together with Impala’s parent company Xago Africa Limited are the "Sponsors". The Project was selected by the Government of Zimbabwe as the Government Project Support Agreement (GPSA) Independent Power Producer (IPP) pilot project with the PPA and GPSA signed in January 2025. The Sponsors are launching a pre-qualification exercise to identify and shortlist suitably qualified Engineering, Procurement and Construction (EPC) Contractors. Those that pre-qualify will have the opportunity to participate in the subsequent EPC tender process. For further information see tender docs.

Commencer

Prêt à remporter plus d'appels d'offres ?

Apportez votre appel d'offres. Nous vous montrons comment Sealio le traite en moins de 10 secondes.